By law, the charges we set can only cover our costs. This means that there are standard charges for specific categories of work, as shown in Schedules A, B and C. If you are carrying out any other project, we will charge you based on our individually determined charges.

You must pay the regularisation charge when you apply for regularisation.

Regularisation is zero-rated for VAT. 

If your plans include work covered by two or more standard charges, you will not have to pay all charges in full. Instead, you will pay the full amount for the most expensive element, plus 50% of the charge for the other applicable elements (excluding the charges listed under B14 and B15). 

We have automatically reduced certain regularisation charges (under code B01 to B13), on the assumption that either:

  • there is no notifiable electrical work
  • or a registered Part P electrician is carrying out controlled electrical installations, including testing and certification

If you claim this reduction when you are not entitled to it, we will invoice you for the outstanding amount (as shown in line B14).

We can't consider your plans unless you have paid the correct amount. If you pay an incorrect amount, we will contact you to let you know.

This means the total of the floor area of all applicable storeys, measured internally.

This means an estimation of the reasonable amount a professional builder would charge to carry out such work, excluding professional fees and VAT.

We set individually determined charges where:

  • the project falls outside the specific categories of Schedules A, B and C
  • these categories do not cover all aspects of the project
  • the categories do not reflect a reasonable charge (an excessive number of categories are applicable)
  • the control of the works reverts to us as the approved inspector is unable to resolve a contravention (the reversion charge is VAT zero rated)

If you need an individually determined charge, you should contact us.

We calculate your charges based on your plans. If your plans change significantly after we have worked out your changes, you may have to pay more or be due a refund. If you need to pay more, we will write to you, setting out our calculations.

You do not have to pay a charge if the whole of the work is solely for providing a person with a disability with:

  • access to, from and within either their own residence, or an existing public building (such as a shop or bank)
  • accommodation or facilities designed to secure their greater health, safety, welfare or convenience

You will need to provide appropriate evidence to show that the work will help the person with the disability or special needs. This would normally be a letter from a medical practitioner or occupational therapist.

After you have submitted your application, we will calculate your charge, based on the information you have given us.

We will then send you a link via email to our payments system. You will only be able to pay the correct figure we have calculated, using credit or debit card.

Guide to charges

You should make sure you are looking at the right type of project to calculate the right charge for your works. The three types are:

  • new dwelling
  • single dwelling
  • non-domestic property

New dwellings should not exceed 300 sqm and all buildings should be no more than three storeys above ground level.

These regularisation charges only apply if you have already carried out the work and are seeking retrospective regularisation.

A07
Code
A07
Type of property/work
Flats
Type of project
New dwelling
Description
2 flats
Charge
Individually determined
A08
Code
A08
Type of property/work
Flats
Type of project
New dwelling
Description
3 flats
Charge
Individually determined
A09
Code
A09
Type of property/work
Flats
Type of project
New dwelling
Description
4 flats
Charge
Individually determined
A10
Code
A10
Type of property/work
Flats
Type of project
New dwelling
Description
5 flats
Charge
Individually determined
A11
Code
A11
Type of property/work
Conversion
Type of project
New dwelling
Description
Conversion to single dwelling-house
Charge
Individually determined
A12
Code
A12
Type of property/work
Conversion
Type of project
New dwelling
Description
Conversion to single flat
Charge
Individually determined
C01
Code
C01
Type of property/work
Extensions
Type of project
Non-domestic property
Description
Separate single storey extension with floor area not exceeding 40m
Charge
£820.00
C02
Code
C02
Type of property/work
Extensions
Type of project
Non-domestic property
Description
Separate single storey extension with floor area exceeding 40m2 but not exceeding 100m2
Charge
£972.00
C03
Code
C03
Type of property/work
Extensions
Type of project
Non-domestic property
Description
Separate extension with some part 2 or 3 storeys in height and a total floor area not exceeding 40m2
Charge
£850.00
C04
Code
C04
Type of property/work
Extensions
Type of project
Non-domestic property
Description
Separate extension with some part 2 or 3 storeys in height and a total floor area exceeding 40m2 but not exceeding 100m2
Charge
£995.00
C05a
Code
C05a
Type of property/work
Alterations
Type of project
Non-domestic property
Description
Cost of work not exceeding £7,500
Charge
£357.00
C05b
Code
C05b
Type of property/work
Alterations
Type of project
Non-domestic property
Description
Replacement of windows, rooflights, roof windows or external glazed doors (not exceeding 20 units)
Charge
£357.00
C05c
Code
C05c
Type of property/work
Alterations
Type of project
Non-domestic property
Description
Renewable Energy systems (not covered by an appropriate competent persons scheme)
Charge
£357.00
C05d
Code
C05d
Type of property/work
Alterations
Type of project
Non-domestic property
Description
Installation of new shop front
Charge
£357.00
C06a
Code
C06a
Type of property/work
Alterations
Type of project
Non-domestic property
Description
Cost of work exceeding £7,500 and not exceeding £35,000
Charge
£592.00
C06b
Code
C06b
Type of property/work
Alterations
Type of project
Non-domestic property
Description
Replacement of windows, rooflights, roof windows or external glazed doors (exceeding 20 units)
Charge
£592.00
C06c
Code
C06c
Type of property/work
Alterations
Type of project
Non-domestic property
Description
Renovation of thermal elements
Charge
£592.00
C06d
Code
C06d
Type of property/work
Alterations
Type of project
Non-domestic property
Description
Installation of a Raised Storage Platform within an existing building
Charge
£592.00
C07a
Code
C07a
Type of property/work
Alterations
Type of project
Non-domestic property
Description
Cost of works exceeding £35,000 and not exceeding £150,000
Charge
£957.00
C07a
Code
C07a
Type of property/work
Alterations
Type of project
Non-domestic property
Description
Fit out of building up to 100m2
Charge
£957.00
Code Type of property/work Type of project Description Charge
A07 Flats New dwelling 2 flats Individually determined
A08 Flats New dwelling 3 flats Individually determined
A09 Flats New dwelling 4 flats Individually determined
A10 Flats New dwelling 5 flats Individually determined
A11 Conversion New dwelling Conversion to single dwelling-house Individually determined
A12 Conversion New dwelling Conversion to single flat Individually determined
C01 Extensions Non-domestic property Separate single storey extension with floor area not exceeding 40m £820.00
C02 Extensions Non-domestic property Separate single storey extension with floor area exceeding 40m2 but not exceeding 100m2 £972.00
C03 Extensions Non-domestic property Separate extension with some part 2 or 3 storeys in height and a total floor area not exceeding 40m2 £850.00
C04 Extensions Non-domestic property Separate extension with some part 2 or 3 storeys in height and a total floor area exceeding 40m2 but not exceeding 100m2 £995.00
C05a Alterations Non-domestic property Cost of work not exceeding £7,500 £357.00
C05b Alterations Non-domestic property Replacement of windows, rooflights, roof windows or external glazed doors (not exceeding 20 units) £357.00
C05c Alterations Non-domestic property Renewable Energy systems (not covered by an appropriate competent persons scheme) £357.00
C05d Alterations Non-domestic property Installation of new shop front £357.00
C06a Alterations Non-domestic property Cost of work exceeding £7,500 and not exceeding £35,000 £592.00
C06b Alterations Non-domestic property Replacement of windows, rooflights, roof windows or external glazed doors (exceeding 20 units) £592.00
C06c Alterations Non-domestic property Renovation of thermal elements £592.00
C06d Alterations Non-domestic property Installation of a Raised Storage Platform within an existing building £592.00
C07a Alterations Non-domestic property Cost of works exceeding £35,000 and not exceeding £150,000 £957.00
C07a Alterations Non-domestic property Fit out of building up to 100m2 £957.00